How Do We Position to Win a Package on the Highway 99 Tunnel Program?

Technical InsightsTransportation & Infrastructure

Packaged procurements reward preparation, and they tend to move faster than the single large contracts they replace. A few things separate the firms that advance from the ones that miss the window. Start by being practical about which package actually fits. Bidding the specialized tunnelling is a different proposition from bidding approaches, structures, roadworks, or utilities. A qualifications submission is stronger when it is aimed at work you can clearly demonstrate you have done, rather than spread thin across everything on offer.

Build the team before the request for qualifications lands, not after. On scopes this size, the most competitive submissions usually pair complementary strengths: a contractor with local delivery capability, a design partner who can stand behind the technical approach, and, increasingly, a First Nations partner. Those relationships take time to form and test, and they are hard to assemble credibly once the clock is running. 

Get the evidence in order early. Current project sheets, key-personnel resumes, safety record, and bonding capacity, all consistent and ready to submit. Packaged procurements are unforgiving of firms still gathering materials when the RFQ opens. 

Finally, compete on understanding, not only price. On geotechnical, structural, and marine scopes, the team that clearly grasps the risks and how to manage them is the one an evaluator trusts. 

Shaping that technical approach behind a pursuit is often where we are brought in. If you are weighing a package on the Massey work or something similar, we are glad to help you think it through. 